There has been a lot of activity on site this week, providing the first glimpse of Stand 47’s form within the landscape of Monaghan Farm. The light steel frame installation process began while the brick retaining walls at the out buildings and garage have been raised to a meter above ground. 

Another important feature of the design that has also been installed consists of the steel columns that support the roof structure and frame the walkway along the northern façade. These were bolted into place and will be fixed to the main structure at a later stage.